McArthur River
Located in Saskatchewan
McArthur Boomerang Discharge Upgrade: Uranium
Year: 2014
Client: Cameco Corporation
Project Scope Performed Under: PBN Nuna Contracting Ltd.
The McArthur River mine, in tandem with Key Lake mine, is the world’s largest producer of high-grade uranium. To prevent erosion and the deposition of materials into Boomerang Lake, a rock-lined conveyance channel was designed by the client to transfer treated mine effluent from an upstream dam location to a new precast outfall structure 420 metres downstream at Read Creek. PBN Nuna Contracting Joint Venture, a partnership with Pinehouse Business North Limited Partnership (Pinehouse First Nation), provided construction services under strict environmental monitoring.
Project Scope
- Clearing
- Peat removal
- Common fill installation
- Channel construction to strict design tolerances
- Geotextile
- Riprap and granular placement
- Installation of a precast outfall structure
- Commissioning
With a small workforce and fleet, PBN Nuna completed the project on schedule and with a solid safety record.
Image Gallery
McArthur River Substation Project
Year: 2014
Client: Cameco Corporation
Project Scope Performed Under: PBN Nuna Contracting Ltd
A new electrical substation and backup diesel generation plant was constructed to support the ongoing expansion of the mine.
Project Scope
- Supply and installation of a firewater line (pipe installation and civil work encompassing over 800 metres of insulated HDPE 6″ and 8” DR11 pipe)
- Construction of firewater huts (3 small light-gauge steel buildings)
- Fencing and barriers
- Supply and installation of a counterpoise (800 metres of guywire excavated and backfilled)
- Miscellaneous site services, including material-receiving support, site laydown preparation, and carpentry work around camp